San Antonio Winery

RDS-San Antonio Winery.jpg

San Antonio WinerY

Description
This new winery production facility features 53,525 s.f. of indoor and 25,250 s.f. of outdoor winery operations, with a capacity of ±150,000 cases per year. The pre-engineered metal building system allows for clear spans, low maintenance, and efficient insulation assemblies to optimize wine production. Phased expansion and flexibility of spaces were major design considerations with approximately 50,000 s.f. of future building expansion potential, allowing another 150,000 cases. All systems have been prepared for modular expansion. High efficiency lighting and environmental control systems are integrated throughout the facility. Additionally, the wine-making process was considered from inception to finished product to streamline adjacencies, circulation patterns, and production flow.

San Antonio Winery is the 2018 American Winery of the Year! Congratulations!

www.sanantoniowinery.com

Type
New Construction, Winery

Location
Paso Robles, California

Project Team
Land Use Consultant - Kirk Consulting
Traffic Analysis - Orosz Engineering Group, Inc.
Surveyor - Twin Cities Surveying Inc.
Geotechnical Engineer - GeoSolutions, Inc.
Civil Engineer - Wallace Group Engineering
Fire Protection Engineer - Advance Fire Protection
Landscape Architect - Firma Consultants
Structural Engineer - Ashley & Vance Engineering, Inc.
Mechanical & Plumbing Engineer - Brummel, Myrick and Associates
Electrical Engineer - Gray Electrical Consulting + Engineering, Corp.
Kitchen Designer - Jim McKeown Inc.
Metal Building Fabricator - Interface Manufacturing, Inc.
Refrigeration - Applied Process Cooling Corp.
Catwalks - Hank’s Welding Service
Air Quality Analysis - Nexus Planning & Consult, LLC
Winery Equipment - P&L Specialties
Wine Tanks - Santa Rosa Stainless Steel
General Contractor - JW Design & Construction, Inc.


RDS-San Antonio Winery.jpg
RDS-San Antonio Winery.jpg
RDS-San Antonio Winery.JPG
RDS-San Antonio Winery.JPG
RDS-San Antonio Winery.JPG
RDS-San Antonio Winery.JPG
RDS-San Antonio Winery.JPG
RDS-San Antonio Winery.JPG
RDS-San Antonio Winery.jpg

Main Floor

 

Jones Residence

parrishhome-2893-Edit.JPG

Jones Residence

Type
New Construction, Single Family Residence

Location
Creston, California

Project Team
Land Use Consultant - Kirk Consulting
Surveyor - MBS Land Surveys
Geotechnical Engineer - Earth Systems Pacific
Civil Engineer - Wallace Group Engineering
Structural Engineer - Ashley & Vance Engineering, Inc.
Energy Compliance - Carstairs Energy, Inc.
Interior Designer - Inner Light Interior Design
General Contractor - Rarig Construction Inc.

Description
This new 2-story, 2,400 s.f. single family residence features a wrap around porch to take in the panoramic views of the rolling hills. This 3 bedroom/2.5 bath house was designed as a “forever home” by including elements that allow for aging in place. The master suite and living areas share the lower floor to allow for single level living. An elevator provides access to the second floor guest bedrooms and hobby rooms. Careful farmhouse detailing brings a warm and cozy atmosphere to the spaces and well-placed windows allow abundant natural light to pour in.


parrishhome-2976 edit.JPG
RDS-Jones Residence.jpg
RDS-Jones Residence.jpg
RDS-Jones Residence.jpg

MAIN FLOOR


Upper Floor


 

Paso Robles Winery

RDS-Paso Robles Winery.jpg

Paso Robles Winery

Type
New Construction, Winery

Location
Paso Robles, California

Project Team
Land Use Consultant - Kirk Consulting
Surveyor - Pacific Coast Survey & Design Group, Inc.
Civil & Structural Engineer - Ashley & Vance Engineering, Inc.
Rendering - United Renderworks

Description
A phased boutique winery with a buildout capacity of 2,500 cases. The winery processing portion of the facility includes 6,265 s.f of interior fermentation and barrel storage and 1,720 s.f of exterior covered crush pad. The 2-story admin and hospitality portion includes winemaking and staff offices on the lower level and a tasting room on the upper level with incredible views of the surrounding vineyard and oak-covered hillsides.


Main FLOOR


Lower FLOOR


 

Julian Residence

RDS-Julian Residence.jpg

Julian Residence

Type
New Construction, Single Family Residence

Location
Paso Robles, California

Project Team
Rendering - United Renderworks

Description
Located on a sloped site in western Paso Robles, this residence features a subterranean garage and a 2 bedroom residential unit constructed from shipping containers on the upper level. The foundation is board formed concrete. The shipping containers cantilever into the wooded landscape, creating a “tree house” experience.


MAIN FLOOR


LOWER FLOOR


 

Morro Bay Library

RDS-Morro Bay Library.jpg

Morro Bay Library

Type
Remodel, Public Library

Location
Morro Bay, California

Project Team
Structural Engineer - Lampman & Associates
Mechanical Engineer - Brummel Mechanical Engineering, LLP
Electrical Engineer - Gray Electrical Consulting + Engineering, Corp.
General Contractor - T. Simons Co. Inc.

Description
This 6,760 s.f. 1-story library remodel features a unification of the existing library spaces. Beautiful feature walls are a nod to Morro Bay’s coastal heritage. Improved circulation and space allocation help to serve the needs of the library’s staff and patrons.


RDS-Morro Bay Library.jpg
RDS-Morro Bay Library.jpg
RDS-Morro Bay Library.jpg
I have always loved libraries and Morro Bay’s beauty. Now you have a place for lovers of books to meet beautiful architecture and excellent resources for learning & pleasure. THANK YOU!!
— Library Patron
Children’s Reading Area

MAIN FLOOR


 

Sextant Winery

RDS-Sextant Winery.jpg

Sextant Winery

Type
New Construction, Winery

Location
Paso Robles, California

Project Team
Land Use Consultant - Kirk Consulting
Surveyor - Twin Cities Surveying Inc.
Geotechnical Engineer - Buena Geotechnical Services, LLC
Civil Engineer - Chouinard Joseph PE
Landscape Architect - Dufau Landscape Inc.
Structural Engineer - Lampman & Associates
Mechanical & Plumbing Engineer - Murphy Mechanical
Electrical Engineer - Power and Communications Engineering
Energy Compliance - Central Coast Energy Compliance
Interior Designer - Design Collaborative, Inc.
General Contractor - Steve Boyle Construction

Description
This 2,500 s.f. winery includes a tasting room overlooking fermentation and barrel storage below. A VIP room has views to the crush pad and surrounding hillsides. Event spaces were designed for both daytime and nighttime events. Local stone and other natural building materials were used throughout the project.

www.sextantwines.com


RDS-Sextant Winery.jpg
RDS-Sextant Winery.jpg
RDS-Sextant Winery.jpg
RDS-Sextant Winery.jpg
RDS-Sextant Winery.png
RDS-Sextant Winery.jpg

MAIN FLOOR


LOWER FLOOR


 

Green Valley Winery


Green Valley Winery

Description
This project includes site development to the existing property containing the winery, distillery, and tasting room to accommodate the growing business. Two new 3,000 s.f. winery production buildings are located on the lower portion of the site, to avoid blocking the views from the existing tasting room. The outdoor space between the two buildings will serve for production circulation as well as large events.

Type
New Construction, Winery

Location
Paso Robles, California

Project Team
Land Use Consultant - Kirk Consulting
Surveyor - Justin Dickerson
Geotechnical Engineer - Earth Systems
Civil Engineer - Above Grade Engineering
Fire Protection Engineer - PTrutner Fire Protection Engineering Inc.
Landscape Designer - Landwell Design + Build Co.
Winery Waste Water - Wallace Group Engineering
Rendering - United Renderworks



BUILDING 1 - MAIN FLOOR


BUILDING 2 - MAIN FLOOR


 

Green Valley Bed & Breakfast


Green Valley Bed & Breakfast

Description
This project includes site development to the existing property containing the winery, distillery, and tasting room to accommodate the growing business. The bed & breakfast component includes nine 400 s.f. modular units. These units are built on stilts and connected by a boardwalk to take visitors through the surrounding vineyard. This development gives visitors a holistic experience with the farm to table concept.

Type
New Construction, Hospitality

Location
Paso Robles, California

Project Team
Land Use Consultant - Kirk Consulting
Surveyor - Justin Dickerson
Geotechnical Engineer - Earth Systems
Civil Engineer - Above Grade Engineering
Fire Protection Engineer - PTrutner Fire Protection Engineering Inc.
Landscape Designer - Landwell Design + Build Co.
Winery Waste Water - Wallace Group Engineering
Rendering - United Renderworks


B&B UNIT 1 - MAIN FLOOR


B&B UNIT 2 - MAIN FLOOR